IEC-61850-4 Communication networks and systems for power utility automation - Part 4: System and project management

IEC-61850-4 - EDITION 2.1 - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of IEC standards.
The following bibliographic material is provided to assist you with your purchasing decision:

Included in this current edition are the following subparts:

 FOR ED. 2.0 AMENDMENT 1 SEE - Nov. 1, 2020
 EDITION 2.1 - Nov. 1, 2020

IEC 61850-4:2011+A1:2020 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This consolidated version consists of the second edition (2011) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication.

This publication is of core relevance for Smart Grid.
ORDER

Price:

$506.00        


Want this as a site license?

To find similar documents by classification:

33.200 (Telecontrol. Telemetering Including Supervising, Control and Data Acquisition System (SCADA))

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

Document Number

IEC 61850-4 Ed. 2.1 en:2020

Revision Level

EDITION 2.1

Status

Current

Publication Date

Nov. 1, 2020

Committee Number

57