ASTM-D4378 Standard Practice for In-Service Monitoring of Mineral Turbine Oils for Steam, Gas, and Combined Cycle Turbines

ASTM-D4378 - 2024 EDITION - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of ASTM standards.
The following bibliographic material is provided to assist you with your purchasing decision:

Standard Practice for In-Service Monitoring of Mineral Turbine Oils for Steam, Gas, and Combined Cycle Turbines
ORDER

Price:

$69.00        


Want this as a site license?

Scope

1.1 This practice covers the requirements for the effective monitoring of mineral turbine oils in service in steam and gas turbines, as individual or combined cycle turbines, used for power generation. This practice includes sampling and testing schedules to validate the condition of the lubricant through its life cycle and by ensuring required improvements to bring the present condition of the lubricant within the acceptable targets. This practice is not intended for condition monitoring of lubricants for auxiliary equipment; it is recommended that the appropriate practice be consulted (see Practice D6224).

1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.3 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Significance and Use

4.1 This practice is intended to assist the user, in particular the power-plant operations and maintenance departments, to maintain effective lubrication of all parts of the turbine and guard against the onset of problems associated with oil degradation and contamination. The values of the various test parameters mentioned in this practice are purely indicative. In fact, for proper interpretation of the results, many factors, such as type of equipment, operation workload, design of the lubricating oil circuit, and top-up level, should be taken into account.

Keywords

gas turbines; in-service monitoring; mineral; mineral turbine oil; monitoring program; steam turbines; turbine oil;

To find similar documents by ASTM Volume:

05.02 (Petroleum Products and Lubricants (II): D3711 - D6122)

To find similar documents by classification:

27.040 (Gas and steam turbines. Steam engines Hydraulic turbines, see 27.140)

75.100 (Lubricants, industrial oils and related products Including mineral oils, fluids for metal working and for temporary protection against corrosion Lubrication systems, see 21.260 Insulating oils, see 29.035.40)

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

 

Customers who bought this document also bought:

ASTM-D4057
Standard Practice for Manual Sampling of Petroleum and Petroleum Products

ASTM-D6224
Standard Practice for In-Service Monitoring of Lubricating Oil for Auxiliary Power Plant Equipment

Document Number

ASTM-D4378-24

Revision Level

2024 EDITION

Status

Current

Modification Type

Revision

Publication Date

March 19, 2024

Document Type

Practice

Page Count

19 pages

Committee Number

D02.C0.01