BS-5975 › Code of practice for temporary works procedures and the permissible stress design of falsework
The following bibliographic material is provided to assist you with your purchasing decision:
Keywords
Modulus of elasticity;Structural design;Temporary structures;Dimensions;Climatic loading;Density;Visual inspection (testing);Hardwoods;Props;Ground-water drainage;Traffic;Supports;Stress analysis;Structural systems;Bending stress;Struts;Legislation;Loading;Design;Softwoods;Steels;Structural timber;Building sites;Brickwork;Field testing;Site investigations;Axial stress;Mechanical properties of materials;Structural members;Erecting (construction operation);Independent scaffolds;Foundations;Beams;Soils;Falsework;Stability;Factor of safety;Soil testing;Maintenance;Structural steels;Mobile scaffolds;Girders;Bailey bridges;Concretes;Strength of materials;Blocks (building);Scaffolding components;Mass;Wind loading
To find similar documents by classification:
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
BS 5975:2019
Revision Level
2019 EDITION
Status
Current
Publication Date
May 30, 2019
Replaces
BS 5975:2008+A1:2011
Page Count
250
ISBN
9780580960222
Committee Number
B/514/26