IEC-61850-7-410 Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

IEC-61850-7-410 - EDITION 2.1 - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of IEC standards.
The following bibliographic material is provided to assist you with your purchasing decision:


IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.
ORDER

Price:

$662.51        


Want this as a site license?

To find similar documents by classification:

33.200 (Telecontrol. Telemetering Including Supervising, Control and Data Acquisition System (SCADA))

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

Document Number

IEC 61850-7-410 Ed. 2.1 b:2015

Revision Level

EDITION 2.1

Status

Current

Publication Date

Nov. 1, 2015

Committee Number

57