IEC-62382 Control systems in the process industry - Electrical and instrumentation loop check

IEC-62382 - EDITION 2.0 - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of IEC standards.
The following bibliographic material is provided to assist you with your purchasing decision:


IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
ORDER

Price:

$187.21        


Want this as a site license?

To find similar documents by classification:

25.040.40 (Industrial process measurement and control)

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

Document Number

IEC 62382 Ed. 2.0 b:2012

Revision Level

EDITION 2.0

Status

Current

Publication Date

Nov. 8, 2012

Committee Number

65E