IEC-62746-10-3 › Systems interface between customer energy management system and the power management system - Part 10-3: Open automated demand response . Adapting smart grid user interfaces to the IEC common information model
IEC-62746-10-3
-
EDITION 1.0
-
CURRENT
Document Center Inc. is an authorized dealer of IEC standards.
The following bibliographic material is provided to assist you with your purchasing decision:
The following bibliographic material is provided to assist you with your purchasing decision:
IEC 62746-10-3:2018 defines and describes methods and example XML artefacts that can be used to build a conformant adapter to enable interoperation between a utility distributed automation or demand response (DR) system based on the IEC common information model (CIM) and a utility smart grid user interface (SGUI) bridge standard (e.g., IEC 62746-10-1) to a customer facility. The scope is restricted to a method to define payload mappings between any specific CIM profile that contains DR/DER information models and the SGUI bridge standards including IEC 62746-10-1.
To find similar documents by classification:
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
IEC 62746-10-3 Ed. 1.0 b:2018
Revision Level
EDITION 1.0
Status
Current
Publication Date
July 1, 2018
Committee Number
118