ISO-18828-2 › Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 2: Reference process for seamless production planning
The following bibliographic material is provided to assist you with your purchasing decision:
ISO 18828-2:2016 describes a reference planning process for seamless production planning.
The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:
· general overview of the reference planning process;
· basic principles of the process model;
· description of each level identified within the reference planning process for production planning;
· structure of activities and relations within each planning discipline;
· dependencies of interdisciplinary activities.
The following items are outside the scope of ISO 18828-2:2016:
· material requirement planning/manufacturing resource planning;
· production order control;
· production process;
· early stage product design;
· order management, inventory management, purchasing, transportation, warehousing;
· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;
· value chain (inbound logistics, operations management, outbound logistics, marketing and sales);
· resource visualization;
· process simulation.
To find similar documents by classification:
25.040.40 (Industrial process measurement and control)
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
ISO 18828-2:2016
Revision Level
1ST EDITION
Status
Current
Publication Date
Oct. 15, 2016
Committee Number
ISO/TC 184/SC 4