Document Center List of Standards on Installations In Buildings Burners And Boilers For Industrial Purposes, See 27.060 Heat Pumps, See 27.080
ICS Code 91.140
Return to ICS Index.Up to Level 1:
Down to Level 3:
- 91.140.01 (Installations in buildings in general)
- 91.140.10 (Central heating systems Including burners and boilers for central heating systems Heating appliances, see 97.100)
- 91.140.30 (Ventilation and air-conditioning systems Including ventilation ducts Ventilators and air-conditioners, see 23.120)
- 91.140.40 (Gas supply systems Including gas meters in buildings)
- 91.140.50 (Electricity supply systems Including electric energy meters in buildings, emergency electrical supplies, etc.)
- 91.140.60 (Water supply systems Including water meters in buildings External water conveyance systems, see 93.025)
- 91.140.65 (Water heating equipment)
- 91.140.70 (Sanitary installations Including bidets, kitchen sinks, baths, waste chutes, etc.)
- 91.140.80 (Drainage systems Sewage water disposal and treatment, see 13.060.30 Drainage systems for rainwater, see 91.060.20 External sewage systems, see 93.030)
- 91.140.90 (Lifts. Escalators)
- 91.140.99 (Other installations in buildings)
The following documents are a part of this series:
BSI:
IEC:
- IEC-60364-5-55 - Electrical installations of buildings - Part 5-55: Selection and erection of electrical equipment - Other equipment
- IEC-60364-5-55-1 - Amendment 1 - Electrical installations of buildings - Part 5-55: Selection and erection of electrical equipment - Other equipment
- IEC-60364-5-55-2 - Amendment 2 - Electrical installations of buildings - Part 5-55: Selection and erection of electrical equipment - Other equipment
- IEC-60364-5-56 - Low-voltage electrical installations - Part 5-56: Selection and erection of electrical equipment - Safety services
- IEC-62056-31 - Part 31: Use of Local Area Networks on Twisted Pair With Carrier Signalling, Electricity M
- IEC-62337 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones