ASTM-C1158 Historical Revision Information
Standard Practice for Use and Installation of Radiant Barrier Systems (RBS) in Building Construction

ASTM-C1158 - 1997 EDITION - SUPERSEDED -- See the following: ASTM-C1744
Show Complete Document History

Document Center Inc. is an authorized dealer of ASTM standards.
The following bibliographic material is provided to assist you with your purchasing decision:

Standard Practice for Installation and Use of Radiant Barrier Systems (RBS) in Building Construction
ORDER

Scope

1.1 This standard has been prepared for use by the designer, specifier, and installer of RBS (radiant barrier systems) for use in building construction. The scope is limited to recommendations relative to the use and installation of RBS including a surface(s) normally having a far-infrared emittance of 0.1 or less, such as metallic foil or metallic deposits unmounted or mounted on substrates. Some examples that this standard is intended to address include: (1) low emittance surfaces in vented building envelope cavities intended to retard radiant transfer across the vented airspace; (2) low emittance surfaces at interior building surfaces intended to retard radiant transfer to or from building inhabitants; and (3) low emittance surfaces at interior building surfaces intended to reduce radiant transfer to or from radiant heating or cooling systems. See Figs.1-4 for typical examples of use.

1.2 This standard covers the installation process from pre-installation inspection through post-installation procedure. It does not cover the production of the radiant barrier materials.

1.3 This standard is not intended to replace the manufacturer's installation instructions, but shall be used in conjunction with such instructions. This practice is not intended to supercede local, state, or federal codes.

1.4 This standard assumes that the installer possesses a good working knowledge of the application codes and regulations, safety practices, tools, equipment, and methods necessary for the installation of radiant barrier materials. It also assumes that the installer understands the fundamentals of building construction that affect the installation of RBS.

1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see Sections 5 and 7.

1.6 When the installation or use of radiant barrier materials, accessories and systems, may pose safety or health problems, the manufacturer shall provide the user appropriate current information regarding any known problems associated with the recommended use of the company's products and shall also recommend protective measures to be employed in their safe utilization. The user shall establish appropriate safety and health practices and determine the applicability of regulatory requirements prior to use.

Keywords

aluminum foil; low emittance; radiant barrier; radiant barrier system; vapor retarder; ICS Number Code 91.120.99 (Other standards related to protection of and in buildings)

To find similar documents by ASTM Volume:

04.06 (Thermal Insulation; Building and Environmental Acoustics)

To find similar documents by classification:

91.120.99 (Other standards related to protection of and in buildings)

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

Document Number

ASTM-C1158-97

Revision Level

1997 EDITION

Status

Superseded

Modification Type

Revision

Publication Date

March 10, 1997

Document Type

Practice

Page Count

3 pages

Committee Number

C16.21