BS-5975 › Historical Revision Information
Code of practice for temporary works procedures and the permissible stress design of falsework
The following bibliographic material is provided to assist you with your purchasing decision:
Keywords
Construction operations;Quality control;Temporary structures;Loading;Field testing;Mechanical properties of materials;Structural members;Struts;Floor centres;Steels;Falsework;Site investigations;Motorways;Multi-storey buildings;Structural timber;Blocks (building);Seas;Mechanical behaviour of materials;Mass;Axial-force-resistant members;Foundations;Beams;Soils;Construction workers;Modulus of elasticity;Structural design;Girders;Structural systems;Mobile scaffolds;Density;Brickwork;Bibliography;Fatigue;Coordination;Building sites;Scaffolding components;Legislation;Traffic;Maritime structures;Climatic loading;Stress analysis;Ocean waves;Bridges;Design;Strength of materials;Softwoods;Bailey bridges;Couplers (scaffolding);Stability;Factor of safety;Visual inspection (testing);Suspended floors;Wind loading;Scaffolding processes;Inspection;Independent scaffolds;Ground-water drainage;Axial stress;Props;Soil testing;Maintenance;Concretes;Supports;Bending stress;Structural steels;Dimensions;Erecting (construction operation)
To find similar documents by classification:
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
BS-5975
Revision Level
AMD 9289
Status
Superseded
Publication Date
Dec. 15, 1996
Committee Number
B/514