ASTM-C1188 › Historical Revision Information
Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities
The following bibliographic material is provided to assist you with your purchasing decision:
Scope
1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.
1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use.
1.3 The basic elements of a quality assurance program appear in the following order:
FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures ∧ Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20Keywords
facilities; quality assurance; uranium; ICS Number Code 03.120.10 (Quality management and quality assurance); 27.120.30 (Fissile materials and nuclear fuel technology)
To find similar documents by ASTM Volume:
To find similar documents by classification:
03.120.10 (Quality management and quality assurance)
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
ASTM-C1188-91
Revision Level
1991 EDITION
Status
Superseded
Modification Type
Editorially changed
Publication Date
May 15, 1991
Document Type
Guide
Page Count
8 pages
Committee Number
C26.08